114 Street (92A Avenue to 96 Avenue) Roadway Improvement Project

overview-114-street

Overview

The 114 Street Roadway Improvements Project is part of the City of Delta's Neighbourhood Road Improvements Plan, which was introduced in 2012 to address aging roads and sidewalks in our community. The goal of this project is to improve access around our community for vehicles, cyclists and pedestrians; helping make our streets and communities safer, greener and more livable. The road improvements will formalize the roadway along 114 Street and will improve on street lighting (visibility at night), pedestrian and cyclist safety, drainage, and street aesthetics.

The proposed improvements along 114 Street include:

  • Roadway re-paving and widening to Delta’s collector road standard (12.0m wide road width);
  • New concrete barrier curb/gutter and sidewalk where necessary;
  • New dedicated bike lanes on both sides (street parking on east side only);
  • New LED street lighting;
  • Storm main install, ditch infill and drainage improvements;
  • Grassed boulevard strips with new boulevard trees and drainage swales following “Best Management Practices” (BMP’s); and
  • Bus stop improvements.

Learn about the typical stages of construction for this project: Road Construction Process.

Photo Renderings

Facing North


114 St looking North (1) - Before

114 St looking North1_v002 2019_11_26

114 St looking North (2) - Before

114 St looking North2_v002 2019_11_26


Facing South


114 St looking South - Before

114 St looking South 02 2019_11_26

Project Timeline

The section of watermain between 92A Avenue and 94 Avenue was replaced as part of Delta’s aging watermain replacement initiative. This work was completed in Fall 2019.

Construction for the 114 Street Roadway Improvements Project is expected to commence Spring 2020, pending Council approval.

Public Consultation

A Public Information Meeting was held on February 4, 2016, to discuss the proposed design and construction timeline.

Updates have been made to the design, since the first Public Information Meeting, to bring the design up to current standards. As such, a second Public Information Meeting was held on November 28, 2019, to provide updates to residents. Updates include, but are not limited to, the addition of bike lanes and street parking impacts along the west side of 114 Street.

Reports and Related Documents

Contact Information

For more information, please email the Engineering Department or call 604-946-3260.